According to Startup Pakistan, Lahore's first trackless electric tram is ready to run on the city's roads, with a formal opening possible on 28 November. Punjab Chief Minister Maryam Nawaz Sharif says the battery-powered service will begin operating next week, calling it a milestone for modern public transport in the province.

The vehicle is a battery-powered Super Autonomous Rapid Transit system, known as SRT, that runs on rubber tyres instead of steel rails and needs no overhead power lines. Startup Pakistan reports that it follows a fixed route using a virtual track, with GPS, digital maps and sensors guiding it, and that it was imported from China and assembled at Lahore's Central Business District.

The tram has three connected coaches with room for about 320 passengers, and the coaches are air-conditioned with Wi-Fi and CCTV cameras, Startup Pakistan reports. PakWheels reports that the vehicle arrived in Pakistan around July 2025, was tested in mixed traffic, and that the chief minister took a test ride in August 2025.

Advertisement

The proposed route would connect the Central Business District with Jail Road, Mall Road and Istanbul Chowk, while a corridor along Canal Road from Thokar Niaz Baig to Harbanspura is also under consideration. The Lahore trackless tram is intended to complement the Metro Bus, the Orange Line train and the city's electric buses, but the final route, fares and operating hours have not yet been officially announced.

Why it matters

Lahore's traffic problem is the reason this vehicle matters. The city has spent a decade adding metro buses, a metro train and electric buses, yet its roads still choke at rush hour, and every new system has to prove it can move large numbers of people without years of construction. A trackless tram promises the capacity of a tram without the civil works: no rails to lay, no wires to hang, no streets torn up for months. If it works in live traffic, it is the fastest way to add a high-capacity corridor Lahore has ever had.

The unanswered route question is the real test, though. The original Canal Road plan was dropped over environmental concerns, including the possible cutting of trees, and the chief minister's announcement named no replacement. A tram without a published route is a promise, not a service, and commuters cannot plan around it until Punjab says where it will run, where it will stop and how often. The first week of operation will be judged less on the vehicle than on whether the government publishes that plan.

The economics are the other open question. Early fare estimates of Rs20 to Rs30 would make the tram cheaper than most alternatives, and free rides during the trial period will fill the coaches fast. But a three-coach electric vehicle that needs fast charging and a driver on board for safety is not a cheap thing to run, and the province has not said what the service will cost once the trial ends. The fare decision will decide whether this becomes a daily service for ordinary commuters or a showcase that runs half empty.

Timeline: the tram arrived in Pakistan around July 2025 and was tested in mixed traffic in Lahore; the chief minister took a test ride in August 2025; on 25 November 2026, Maryam Nawaz announced on her official X account that the service would begin operating next week; a formal opening is possible on 28 November, with free rides expected during initial trials.

What to watch next

Watch for the route announcement, which Punjab is expected to publish before the first public runs. Whether the Canal Road corridor is restored or a new alignment is chosen will decide which neighbourhoods benefit and how much of the city's congestion the tram can actually relieve.

Watch the trial itself. Free rides will draw crowds, but the numbers that matter are reliability, charging time and how the vehicle behaves in Lahore's mixed traffic with a driver still on board. If it runs on time for a full week, other Pakistani cities will start asking for one.

Frequently asked questions

When will Lahore’s trackless tram start running?

Punjab Chief Minister Maryam Nawaz has said it will begin operating next week, with a formal opening possible on 28 November 2026.

How does a trackless tram work?

It is a battery-powered vehicle that runs on rubber tyres on ordinary roads, following a digitally mapped virtual track using GPS, maps and sensors, with no rails or overhead wires.

How many passengers can it carry?

About 320 passengers across three connected coaches, which are air-conditioned and fitted with Wi-Fi and CCTV cameras.

What will the fare be?

No fare has been officially announced. Early estimates suggest Rs20 to Rs30 per ride once regular service begins, with free rides during the initial trial phase.